Across all 7 tiles, the gaps collapse onto 3 unlocks. Build these and most of the system lights up at once.
| 🚀 launch | U1 · 7 P0 signal fields | journey · niches · delivery · offers | Souky UI (~30 min) |
| 🚀 launch | U2 · DIA-369 agent rebuild (Maya/Ana/Pax/Dax + KB) | niches · delivery · journey · offers | Vulcan + Lyra |
| 🚀 launch | U3 · AXIS implementation | delivery · agents · client experience | Vulcan + Souky |
BUILD-ORDER LAW (Souky, 2026-06-02): build the delivery workflows BEFORE you start the machine (sell/acquire). Selling before delivery exists = non-delivery (a promise the system can't keep). It's all interrelated (D109) — light the BACK (deliver) before the FRONT (sell). Order: ① build delivery → ② start machine.
| 💰 June-revenue | ① BUILD FIRST — the DELIVERY workflows for the chosen offer × 1st niche: the §12.8/§12.9 + 30-day workflows THAT offer needs + that ONE niche's overlay (realtor ready) + AXIS wiring. Scoped to one offer × one niche. The machine must be able to DELIVER before it sells. | journey + niches + delivery | Vulcan + Lyra |
| 💰 June-revenue | ② THEN — the SELL surface for that offer: Stripe product + funnel. Closest: RRS (funnel validated) or WoML (decks ready) | offers | Souky (Stripe) + Vulcan |
| 💰 June-revenue | ② THEN — Prospection live pipeline: A12 + A13 → A01 ENTRY-ROUTING publish → arcs + A02 (leads route + nurture) | prospection | Vulcan/Souky |
| 💰 June-revenue | ② THEN — First-proof instance to Day 30: a real client flows through and IS delivered (works because delivery was built in ①) | client-delivery | Souky (Cat A) + Vulcan |
| 🚀 launch | DFD Layer-B funnel surface — only if DFD is the chosen first offer (else defer behind RRS/WoML) | offers | Souky (Cat A) |
| 💰 June-revenue | 6 of 7 Stripe product specs | offers | Vulcan → Souky |
Only AFTER one offer × one niche is proven end-to-end. Replication + a 2nd acquisition channel, not the first delivery.
| 🔧 tuning | Fan out to the other 5 niches — inherit the proven overlay verbatim (allsmallbiz master · chiro v1→v4 · medspa/vet/home 30day overlays) | niches | Lyra/Athena (+Cat A chiro) |
| 🔧 tuning | Generalize §12.9 IMPRESS — the consolidated owner workflow + the full 6 30-day workflows across offers (the per-offer slice was built in T1) | journey | Souky/Claude → Vulcan |
| 🔧 tuning | Cold-email machine (A10) — a 2nd acquisition channel (only if the first channel isn't feeding enough) · 42 templates | prospection | Codex/Vulcan |
| 🔧 tuning | Per-offer completion — RRS legacy 'Intake' naming · Flywheel DIA-509 · YDFC chat-widget | offers/delivery | Vulcan |
| 🔧 tuning | D108 restore 14 signals in offer masters + drift cleanup (Intake→RRS · Site→Connect) | offers | Athena |
| ⏸️ earned-later | Continuity System (RFM / win-back / Plai) | — | Phase 2 maturity gate |
| ⏸️ earned-later | Relationship Continuum | — | development · Sep 2026 |
| ⏸️ earned-later | Instance population (108 combos) | — | scale-blocked on first proof |
| ⏸️ earned-later | Close-recovery D62 (A06/07/08) | — | no-spec · Souky disposition |